Main Street SlowdownMain Street SlowdownDrivers on East Main Street in the town of Union are encountering new traffic patterns because of a long-planned reconstruction job.Bob JosephBob Joseph
Downtown Street ProjectDowntown Street ProjectSections of two downtown streets were closed to traffic as a Binghamton resurfacing project got underway.Bob JosephBob Joseph
$2.9 Million Main Street Project$2.9 Million Main Street ProjectWork has started on a $2.9 million project to resurface and improve traffic flow on a section of Route 17C in the town of Union.Bob JosephBob Joseph
Section of Vestal Road Shut DownSection of Vestal Road Shut DownA section of a normally-busy town of Vestal roadway remains out of service because of a broken sewer line.Bob JosephBob Joseph
Downtown Traffic Detoured by Repair JobDowntown Traffic Detoured by Repair JobSections of two busy streets in downtown Binghamton were shut down while crews replaced underground wiring for traffic signals.Bob JosephBob Joseph
Fire Slows Route 17 TrafficFire Slows Route 17 TrafficA lane of Route 17 in Binghamton was closed for a short time after a smoky brush fire broke out along the expressway.Bob JosephBob Joseph
Lengthy Binghamton Underpass ClosureLengthy Binghamton Underpass ClosureA major project will close a section of a heavily-traveled roadway linking Binghamton's West Side with the First Ward for several weeks.Bob JosephBob Joseph
Rapid Walkway RemovalRapid Walkway RemovalThe project to remove an unused elevated walkway near Boscov's in downtown Binghamton is nearing completion.Bob JosephBob Joseph
It Happened on Vestal RoadIt Happened on Vestal RoadThere's relief for thousands of drivers a day who have coped with a detour that was supposed to have lasted two years but instead was in place for nearly three-and-a-half years.Bob JosephBob Joseph
Vestal Road to ReopenVestal Road to ReopenA section of Vestal Road that's been closed to westbound traffic for more than three years could be back in service within the next few days.Bob JosephBob Joseph